With the purchase of the Skoll building, which will be used as a loading bay, the brewery can expand its production capacity even further. In order to meet the increasing demand for Alfa beer, a second filling line is placed in the brewery, thus increasing production capacity from 12,000 bottles to 24,000 bottles per day. Source: The Limburger